A global mining company identified opportunities to improve isolation management processes and high-risk work activities. Even with electronic isolation systems already in place, the company felt it was time to investigate a system that combined permit to work and isolation management for managing high-risk processes.

After tailoring a fully integrated Oil and Gas permitting system to the mining industry, the company conducted a pilot to evaluate the potential of the digital permitting and isolation management system for improving the management of high-risk processes, increasing operational safety.

Download now
CS – BHP Mining Thank You

Talk to an expert

Get in touch.

Latest insights from Sphera

When a Topic is Material, Not Everything is: Datapoint-Level Materiality Explained

When a Topic is Material, Not Everything is: Datapoint-Level Materiality Explained

Material topic ≠ report everything. Learn how to apply datapoint-level materiality under ESRS to prioritize decision-useful data and…
April 29, 2026
Why supplier scores are no longer enough

Why supplier scores are no longer enough

Beyond EcoVadis: Why supplier scores aren't enough for 2026 resilience. Move from static ratings to real-time N-tier visibility…
April 27, 2026
Five Ways to Keep Data Optimized for AI

Five Ways to Keep Data Optimized for AI

Master supply chain risk management with Sphera. Move from fragmented data to AI-driven intelligence for proactive ESG compliance…
April 24, 2026